Skip to main content
04 April 2023

After the demolition begins the construction

This already feels much better. In the stern of the Dagmar Aaen, the shipyard installs solid oak planks that are filigree fitted by the boat builders. The new 110 meter long anchor chain is marked by Katja and Julia and then winched into the chain locker. Micha saws new mast wedges so that the mast is properly fixed. The old ones had become loose. The propeller is polished and at the same time the hull is sanded and painted. The blacksmith has renewed the hydraulic system for the steering gear, next the cylinder heads from the main engine will be replaced.
One position after the other is worked off.